If you work in design engineer jobs or even in engineering jobs then you will understand how important it is to keep on top of everything. The London City Airport chief has stated that there is over £300M worth of work to be done as a result of their new extension program. He has stated that the work includes the construction of the car park building and even mechanical work as well. There is also a lot of mechanical work to be done and fit-outs for all of the fixtures. The airport is undergoing a huge £480M expansion and they are also going to be constructing a new terminal building as well. This is going to have three times the capacity of the terminal that is there at the moment and it is going to have a new taxi runway as well. This is going to be built into the area and the work that they have been doing has really involved a lot of cleaning and enabling work as well.
He's stated that they have just started to feel the impact of the build and that they have also tried to create a solid framework as well. They want to allow more land to be released so they can cater for the additional capacity of the airport. They also want to replace the control tower with digital technology so that the whole thing can be made way more efficient. This gives them the chance to control any aircraft from a facility in the area of Southampton.
This is really great to hear and it's incredible to think about how much things have changed over the years. This new technology will really give people chance to excel and do their job better on a daily basis.